







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Kitchen Remodeling in Enterprise, NV
A full kitchen remodel in Enterprise, NV typically runs $28,000 to $85,000 depending on square footage, whether the layout moves, and the cabinet and countertop lines you choose. That number covers demolition, framing changes, electrical and plumbing rough-in, cabinets, counters, tile, and finish work under one written scope. It’s the remodel that replaces nearly everything you can see and touch in the room, not a cosmetic refresh.
Most of the kitchens we’re called to in Enterprise date from the 1999 – 2007 build wave that filled the southwest valley, and they’re showing it: oak cabinets with failing hinge plates, laminate counters lifting at the sink seam, and tile floors that have cracked over a slab that’s still moving a few thousandths of an inch a year. A full remodel is the only fix that addresses all three at once.
Rowan Construction Group Enterprise writes a flat price and a written scope before anyone touches a cabinet. Under Clause 1 of The Haven Standard, no work starts until you’ve seen the number and signed off on it. If you’d like that number, call (833) 630-4077 and we’ll get a free estimate on the calendar. This page covers the full remodel; for the broader category, including partial remodels and refreshes, see our Kitchen Remodeling in Enterprise page.

When You Need Full Kitchen Remodeling
These are the situations where a full remodel pencils out better than a cosmetic upgrade:
- The layout fights you every day. The range sits between the fridge and the sink with no landing zone, so you set hot pans down on the counter across the aisle. Moving the appliance positions means moving gas, electrical, and plumbing, which pushes the job into full-remodel territory.
- Cabinets are failing, not just dated. Particleboard boxes swelling at the toe kick, hinges with stripped screw holes, doors that won’t stay square. In Enterprise’s dry air, cabinet boxes that weren’t sealed properly dry out and split at the face frame, and new doors on old boxes only bury the problem.
- The electrical is original to the house. Two countertop receptacles for the whole kitchen, no GFCI protection, and no dedicated circuit for a microwave or disposal. That’s not a code upgrade you can skip when the drywall comes off.
- You bought in Mountain’s Edge, Southern Highlands, or the Paradise Hills area and the kitchen was never updated. The house was built well but finished to a builder grade that hasn’t held up. A full remodel resets the room to current standards instead of patching pieces one at a time.
- You’re opening the kitchen to the living space. Removing a wall, or part of one, means engineering, a beam, and new ceiling work. This is where a written scope matters most because the surprises hide inside the wall.
- The slab has settled and the room is out of level. A cracked tile floor is often the visible symptom of a deflection issue under the slab. Full remodels give us the chance to address it with a proper underlayment rather than laying new tile over a moving surface.
If you’re weighing a smaller project against the full one, our team can walk through the difference in scope and cost before you commit. See the parent guidance at Kitchen Remodeling.
Our Full Kitchen Remodeling Process
Every full remodel follows the same five steps. The order doesn’t change, and neither does the documentation you receive at each one.
- On-site assessment and written scope. We measure the room, check the electrical panel capacity, trace the plumbing, and inspect the substrate under the existing floor. You get a written scope and a flat price, not an hourly estimate. Photographs of what we found go in your file as standard.
- Selection and sourcing. You choose materials from our vetting list: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone quartz surfaces, Kohler and Toto fixtures. We confirm lead times in writing so the schedule reflects actual delivery, not wishful dates. If you’re adding a prefabricated structure elsewhere on the property, brands like Dvele and Mighty Buildings sit in the same catalog family of vetted suppliers.
- Demolition and rough-in. Crews are background-checked and uniformed, and a documented photo record is captured on every visit, included in your price. Rough-in covers electrical, plumbing, gas, and any framing changes with engineering stamped before the wall opens.
- Install and finish. Cabinet installation, countertop templating and setting, tile work, and trim. Any change to the scope requires a signed change order before work proceeds. No verbal approvals. This is the discipline that keeps a project within a few percent of the number you agreed to.
- Walkthrough and handover. We walk the finished room with you, correct anything on the punch list, and deliver the photo record plus your written warranty. The 365-Day Done Right Promise means if something isn’t right within that window, we make it right.
Our technicians bring up to 19 years of experience to a job, and the crew assignments are matched to that experience level. If you’re bringing a competitor’s estimate, we’ll review it line by line at no charge as part of our free second opinion on any written estimate.

Full Kitchen Remodeling Pricing in Enterprise
Enterprise kitchen remodel pricing depends heavily on whether walls move and what finishes you select. Here’s a realistic range for full remodels in this market, with a flat written price for each scope:
| Scope | Typical price range | What’s included |
|---|---|---|
| Full remodel, cosmetic-only layout | $28,000 – $45,000 | Cabinets, counters, tile, paint, lighting swap, no move of plumbing or gas |
| Full remodel with layout changes | $45,000 – $65,000 | Move of range, sink, or fridge; new electrical circuits; possible minor framing |
| Full remodel with wall removal | $65,000 – $85,000 | Structural beam, engineering, expanded electrical and plumbing, ceiling work |
| Premium finishes added to any of the above | Add $8,000 – $20,000 | Upgraded cabinet line (Wellborn vs KraftMaid entry), Cambria vs Caesarstone, professional-grade appliances |
What pushes a number to the top of its range: moving the gas line to relocate the range, upgrading the electrical panel to support a new induction cooktop, discovering water damage under the sink cabinet, or needing a new subfloor over a cracked slab. What keeps it closer to the low end: keeping appliance positions, choosing cabinet lines with short lead times, and confirming selections before demolition starts.
We quote a flat price with a written scope and a written warranty. “Call for a quote” isn’t how we work; the number is on the page before you sign anything. Call (833) 630-4077 for a free estimate, and bring a competitor’s written estimate if you have one for a free second opinion.
FAQs – Full Kitchen Remodeling
How long does a full kitchen remodel take in Enterprise?
A full kitchen remodel in Enterprise typically takes 8 to 14 weeks from the first demolition day, with layout changes at the higher end. Cabinet lead times drive most of the variance; KraftMaid and Wellborn stock lines usually land in the 4 to 7 week range, while custom door styles add another 3 to 5 weeks. Call (833) 630-4077 for a schedule based on your specific scope.
Does a full remodel need permits, and do you handle them?
Yes. Structural changes, electrical panel work, gas line rerouting, and any wall removal require a permit in Enterprise. Our team pulls permits as part of the written scope and coordinates inspections, so your finished job has an inspection record attached. If you’re working through a homeowners association, check their approval timeline before demolition; that step is separate from the permit and often catches homeowners off guard.
Is it cheaper to repair or replace the kitchen?
It depends on the age of the boxes and the electrical. Replacing cabinet faces on boxes that are structurally sound can save $8,000 to $15,000 over a full remodel, but new faces on failing particleboard boxes only delays the problem a few years. If the electrical is original to a pre-2000s build, upgrading the circuits is usually necessary regardless. The written estimate shows both options side by side so you can compare the actual numbers. Call (833) 630-4077 for that comparison on your kitchen.
Can you start the full remodel this month?
Start dates depend on cabinet availability and permit timing, and we won’t promise a date we can’t hold. What we can promise is a written scope and price before any work starts, so you know what you’re scheduling. Call (833) 630-4077 and we’ll give you a realistic window, free estimate included.
Full kitchen remodels also pair well with other work: if the adjoining room or foyer is getting opened up at the same time, the sequencing is easier and less disruptive when it’s planned in one scope. Our team handles that coordination when you call.
Written by the team at Rowan Construction Group Enterprise, serving Enterprise.


